Concrete Base Installation

Hampshire · South East

Concrete Base Installation in Aldershot

Hot tub owners in Aldershot use our network to find groundworkers who pour strong, perfectly level slabs that protect the tub and warranty.

Get your Aldershot garden room base ready for delivery.

Free Concrete Base Installation quote in Aldershot

No obligation. We only use your details to reply about this job.

Where we work around Aldershot

Aldershot falls within Hampshire, South East. Postcodes we cover here include GU11 and GU12. Nearby places we also cover include Ash Vale, Tongham, Wrecclesham, Mytchett and Upper Hale.

Concrete Base Installation in Aldershot: local know-how

Commuter towns across the South East mix older town-centre terraces with large newer estates, and driveways are more common than in London. Older gardens in Aldershot sometimes hide old drains, coal bunkers or rubble, which groundworkers deal with before laying a new base.

Hot tubs are a popular addition to Aldershot gardens, and a level reinforced slab is the safest way to support them. Many Aldershot homes are adding garden offices, which need reinforced slabs with ducts for power and broadband.

Typical costs in Aldershot

  • Shed base up to 3m by 2.4m: £450–£850. Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal.
  • Break out and remove old base: from £300. Breaking up and taking away an existing shed-sized slab, before a new one is poured.
  • Small pad for bins, tank or heat pump: from £250. Simple pads under about 2m², with several pads in one visit usually cheaper each.

Prices are a guide. Your quote for Aldershot is a fixed price based on the details you give us. Full price guide.

Concrete Base Installation questions from Aldershot

Can you lay a hot tub base in Aldershot?

Yes. Groundworkers in Aldershot lay reinforced, level hot tub slabs with ducts for power, ready for your electrician to connect.

Can concrete be pumped into my back garden in Aldershot?

Yes. Where access is tight in Aldershot, groundworkers can use a concrete pump or mini dumpers instead of barrowing everything through the house.

How long before I can build on a new base in Aldershot?

Most sheds in Aldershot can go up after three to seven days. Heavier buildings and hot tubs should wait at least a week, longer in cold weather.

Can an old base in Aldershot be removed and replaced?

Yes. Groundworkers covering Aldershot break out old bases, remove the waste and pour a new slab sized to your new building.

How long does a concrete base take to cure?

Concrete is usually firm enough to walk on within a day. Most sheds can be built on it after three to seven days. Heavier buildings and hot tubs should wait at least a week. Concrete continues to gain strength for around 28 days, and curing slows in cold weather.

Do I need planning permission for a concrete base?

A base alone rarely needs planning permission in a back garden. The building that sits on it may need permission depending on its size, height and position. Large hard surfaces in front gardens in England must drain naturally or need permission.

Get a free concrete base installation quote in Aldershot

Tell us what you need and we'll come back with a clear price.

Request a quote