Nationwide · England, Scotland & Wales
Concrete Base Installation across the UK
Level, solid concrete bases for sheds, garden rooms and hot tubs.
In short
Concrete Base Installation is the preparation and pouring of a flat, level concrete slab to support a shed, garden room, summerhouse, hot tub, garage or other outbuilding. It involves setting out, excavating, laying and compacting a hardcore sub-base, fixing timber formwork, adding a membrane and steel mesh where needed, then pouring, levelling and finishing the concrete to the right thickness.
- Free, no-obligation quotes
- Vetted, insured specialists
- Clear fixed prices
Fixed, clear prices
One all-in price before any work starts.
Vetted specialists
Insured teams who do this work every week.
Responsible disposal
Licensed waste routes and proper paperwork.
500 areas covered
Pages for every town we serve.
Every outbuilding is only as good as the base under it. A shed on an uneven slab will have doors that stick and a floor that rots. A garden room on a poor base can crack, rock or let damp in. A hot tub weighing several tonnes when full needs a slab that will not sink at one corner. We arrange concrete base installation through a network of vetted, insured local groundworkers who set out, dig and pour properly.
A typical shed or garden room base takes one to two days to prepare and pour, then a few days to cure before anything is built on it. Our groundworkers will match the size and specification to the building manufacturer's instructions, deal with access and concrete delivery, and take away the spoil. Tell us what the base is for and its size, and we will match you with someone local for one clear price.
Our Concrete Base Installation services
Shed and Summerhouse Bases
Level concrete slabs sized to your shed or summerhouse, on a compacted hardcore sub-base, ready for the building to go straight on.
Find out more →Garden Room and Office Bases
Reinforced slabs built to the garden room supplier's specification, with ducts for power, data and water cast in before the pour.
Find out more →Hot Tub and Swim Spa Bases
Strong, level, reinforced slabs to carry the heavy load of a filled hot tub or swim spa, with power ducting and drainage considered.
Find out more →Garage and Workshop Slabs
Thicker reinforced concrete slabs, often with thickened edges, for concrete sectional garages, timber workshops and steel buildings.
Find out more →Concrete Pads and Hardstandings
Pads for bins, air source heat pumps, oil tanks, log stores, greenhouses and parking, built to suit the load and use.
Find out more →Base Removal and Replacement
Breaking out cracked, sunken or undersized bases, removing the waste and pouring a new slab ready for your replacement building.
Find out more →How it works
Tell us what the base is for
Use the quote form to give the size, the building or item it will carry and the current ground surface. Include the supplier's base specification if you have it, and photos of access from the road.
Site visit and setting out
A local groundworker checks levels, ground conditions, access for barrows or a concrete lorry, and positions for ducts. They confirm slab thickness, reinforcement and sub-base depth for your use.
Fixed quote
You receive one price covering excavation, waste removal, hardcore, formwork, membrane, mesh, concrete and finishing. The quote states the slab thickness and size so you can compare like for like.
Dig, form and pour
Turf and soil are removed, hardcore compacted, formwork and membrane fixed, ducts placed and concrete poured and finished. Most domestic bases are prepared and poured in one or two days.
Curing and handover
The slab is covered to cure, protecting it from frost, rain or hot sun. The groundworker removes formwork and tells you when it is ready for your building, hot tub or garage.
Concrete Base Installation prices
Concrete bases are priced mainly by area and thickness, with adjustments for access, excavation and reinforcement. Small bases carry a minimum charge because the labour, kit and delivery are similar whatever the size. Mixing by hand or using a mini mixer suits small pads, while larger slabs use ready-mix. The figures here reflect what UK homeowners typically pay for base work in 2026.
| Job | Guide price | Notes |
|---|---|---|
| Shed base up to 3m by 2.4m | £450–£850 | Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal. |
| Garden room base | £70–£110 per m² | Reinforced 100–150mm slab with membrane, blinding and ducts cast in to the supplier's layout. |
| Hot tub base | £600–£1,200 | Reinforced level slab for a standard hot tub of around 2.2m square, with power duct. |
| Single garage base | £1,800–£3,200 | Thicker reinforced slab, typically around 6m by 3m, set out square for a sectional garage. |
| Small pad for bins, tank or heat pump | from £250 | Simple pads under about 2m², with several pads in one visit usually cheaper each. |
| Break out and remove old base | from £300 | Breaking up and taking away an existing shed-sized slab, before a new one is poured. |
Who we work for
Homeowners buying sheds and summerhouses
People who have ordered a timber or metal shed or summerhouse and need a level, durable base ready before delivery day.
Garden room buyers
Homeowners investing in a garden office, studio or gym who need a base built exactly to the supplier's specification, with power and data ducts in place.
Hot tub owners
Buyers of hot tubs and swim spas who need a strong, perfectly level slab so the shell is supported and the manufacturer's warranty stays valid.
Heat pump and tank installers
Homeowners and heating engineers needing small, accurate pads for air source heat pumps, oil tanks and battery storage units.
Garden building suppliers
Companies selling sheds, garages and garden rooms that want reliable local groundworkers to prepare bases for their customers before installation.
Rules and standards that apply
- In England, outbuildings are often permitted development, but they must be no more than 2.5 metres high if within 2 metres of a boundary and must not cover more than half the garden; the base does not change these limits.
- Whether the building on your base needs Building Regulations approval depends on its size and use: in England and Wales, detached outbuildings below 15 square metres without sleeping accommodation are normally exempt, as are 15 to 30 square metre buildings at least 1 metre from the boundary or made mainly of non-combustible materials.
- Concrete for domestic slabs is commonly specified using BS 8500, which sets out strength classes and mixes suitable for different exposures.
- Turf, soil and broken concrete removed from site is controlled waste and should be taken away by a registered waste carrier.
- Any electrical supply run to an outbuilding through ducts in the base should be installed by a qualified electrician to BS 7671.
How to choose the right concrete base installation company
- Ask what slab thickness, hardcore depth and reinforcement they propose, and why that suits your building.
- Share your building supplier's base specification and check the groundworker will follow it.
- Confirm the price includes excavation, spoil removal and making good around the base.
- Ask how they will get concrete to the site, whether by lorry, pump, dumper or barrow.
- Check they will cast in ducts for power, data and water before the pour if needed.
- Make sure they hold public liability insurance and explain how long the slab must cure.
Frequently asked questions
How much does a concrete shed base cost?
A concrete base for a typical shed up to about 3m by 2.4m usually costs £450 to £850 fitted, including excavation, hardcore, membrane and concrete. Larger bases for garden rooms cost around £70 to £110 per square metre. Difficult access or sloping ground adds to the price.
How thick should a concrete base be?
Around 100mm of concrete on 75mm to 100mm of compacted hardcore suits most sheds. Garden rooms and hot tubs usually need 100mm to 150mm with steel mesh. Garages and heavy loads typically need 150mm or more, reinforced. Always check your supplier's specification.
How long does a concrete base take to cure?
Concrete is usually firm enough to walk on within a day. Most sheds can be built on it after three to seven days. Heavier buildings and hot tubs should wait at least a week. Concrete continues to gain strength for around 28 days, and curing slows in cold weather.
Does a shed base need to be bigger than the shed?
Slightly. A base around 50mm larger than the shed on each side gives a firm edge without letting rain collect under the walls. Too large a margin lets water pool against the timber. Some suppliers recommend the base matches the floor size exactly.
Do I need a damp-proof membrane under a concrete base?
For garden rooms, offices and anything you want to keep dry, yes. A polythene damp-proof membrane under the concrete stops ground moisture rising. Many groundworkers use one under shed bases too, as it costs little and helps keep the building dry.
Does a concrete base need steel reinforcement?
Light shed bases often do not. Garden rooms, hot tubs, garages and bases on poor or variable ground usually benefit from steel mesh, which controls cracking and spreads the load. Your groundworker will recommend mesh based on what the base supports.
Can a concrete base be laid on a slope?
Yes. On a slope, the groundworker digs deeper on the high side and may build up the low side with formwork or blockwork, so the finished slab is level. Steep slopes may need a stepped base or a small retaining wall.
Do I need planning permission for a concrete base?
A base alone rarely needs planning permission in a back garden. The building that sits on it may need permission depending on its size, height and position. Large hard surfaces in front gardens in England must drain naturally or need permission.
Concrete Base Installation guides
How Much Does a Concrete Base Cost in the UK?
A professionally laid concrete shed base up to 3m by 2.4m typically costs £450–£850 in the UK. Garden room bases cost £70–£110 per square…
Read the guide →How Thick Should a Concrete Base Be? Sheds, Garden Rooms and More
A typical shed base is around 75–100mm of concrete on 75–100mm of compacted hardcore. Garden rooms usually need 100–150mm, often reinforced…
Read the guide →Concrete Base vs Ground Screws vs Paving Slabs: Which Is Best?
A concrete base is the strongest and most versatile foundation for sheds, garden rooms, hot tubs and garages, costing £450–£850 for a…
Read the guide →Preparing for a Concrete Base: What Happens on the Day
Before a concrete base is laid, clear the area, confirm the building size and position, check for buried cables and pipes, and plan a route…
Read the guide →What Base Does a Hot Tub Need? Requirements and Costs
Most hot tubs need a solid, flat, level base strong enough for the full weight when filled with water and people, which can be well over…
Read the guide →Areas we cover
We cover England, Scotland and Wales, with dedicated pages for 500 towns and cities. If your town isn't listed, ask anyway — we probably cover it.
Get a free concrete base installation quote
Tell us what you need and we'll come back with a clear price.
Request a quote