Concrete Base Installation

Concrete Base Installation

Base Removal and Replacement

Breaking out cracked, sunken or undersized bases, removing the waste and pouring a new slab ready for your replacement building.

Free Concrete Base Installation quote

No obligation. We only use your details to reply about this job.

Base Removal and Replacement — Concrete Base Installation

What's involved

Old shed and garage bases are often too small, cracked, sunken or out of level for a new building. The groundworker breaks out the old slab with a breaker, loads the concrete into a skip or grab lorry, and checks the ground underneath for soft spots, roots or old drains. Any problem ground is dug out and replaced with compacted hardcore before a new slab is formed and poured. Sometimes a sound but uneven base can be levelled with a thin bonded topping instead of replacing it, which the groundworker will advise on. Asbestos cement sheeting from old garages must be handled separately by a licensed or appropriately trained contractor before demolition. A typical shed base removal and replacement takes one to two days plus curing time.

How we handle it

  1. Tell us what the base is for

    Use the quote form to give the size, the building or item it will carry and the current ground surface. Include the supplier's base specification if you have it, and photos of access from the road.

  2. Site visit and setting out

    A local groundworker checks levels, ground conditions, access for barrows or a concrete lorry, and positions for ducts. They confirm slab thickness, reinforcement and sub-base depth for your use.

  3. Fixed quote

    You receive one price covering excavation, waste removal, hardcore, formwork, membrane, mesh, concrete and finishing. The quote states the slab thickness and size so you can compare like for like.

  4. Dig, form and pour

    Turf and soil are removed, hardcore compacted, formwork and membrane fixed, ducts placed and concrete poured and finished. Most domestic bases are prepared and poured in one or two days.

  5. Curing and handover

    The slab is covered to cure, protecting it from frost, rain or hot sun. The groundworker removes formwork and tells you when it is ready for your building, hot tub or garage.

Price guide

Concrete bases are priced mainly by area and thickness, with adjustments for access, excavation and reinforcement. Small bases carry a minimum charge because the labour, kit and delivery are similar whatever the size. Mixing by hand or using a mini mixer suits small pads, while larger slabs use ready-mix. The figures here reflect what UK homeowners typically pay for base work in 2026.

  • Small pad for bins, tank or heat pump: from £250. Simple pads under about 2m², with several pads in one visit usually cheaper each.
  • Break out and remove old base: from £300. Breaking up and taking away an existing shed-sized slab, before a new one is poured.
  • Shed base up to 3m by 2.4m: £450–£850. Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal.

Questions about base removal and replacement

How long does it take to lay a concrete base?

Most shed and hot tub bases are dug, formed and poured in a single day. Larger garden room or garage bases may take two days. Curing then takes several days before building, depending on the weather.

What is the best base for a garden room?

It depends on the garden room design. Many suppliers specify a reinforced concrete slab; others use ground screws or concrete pads with a timber frame. A slab gives a solid, durable floor and is a good fit for heavier buildings.

Can concrete bases be laid in winter?

Yes, with care. Concrete should not be poured onto frozen ground or when hard frost is expected before it sets. Groundworkers cover new slabs with insulating sheets or hessian in cold weather and may delay a pour if the forecast is very cold.

Get a free concrete base installation quote

Tell us what you need and we'll come back with a clear price.

Request a quote