Concrete Base Installation

Surrey · South East

Concrete Base Installation in Woking

Whether it is a heat pump pad or a full garden office slab in Woking, our groundworkers cast in ducts so services can be connected later.

Tell us your base size in Woking for a clear price.

Free Concrete Base Installation quote in Woking

No obligation. We only use your details to reply about this job.

Our Woking coverage

We cover all of Woking and the wider Surrey area. Jobs here are mostly in the GU21, GU22, GU24, GU3, GU4 and KT14 postcode areas. Nearby places we also cover include Surrey Heath, Pyrford, Ottershaw, Woodham and West Byfleet.

Local considerations in Woking

Commuter towns across the South East mix older town-centre terraces with large newer estates, and driveways are more common than in London. Period properties in Woking may have mature trees nearby, so slabs are positioned and reinforced to cope with roots.

Suburban gardens in Woking commonly need shed and summerhouse bases, often with side access wide enough for a mini dumper. Many Woking homes are adding garden offices, which need reinforced slabs with ducts for power and broadband.

How much it costs in Woking

  • Hot tub base: £600–£1,200. Reinforced level slab for a standard hot tub of around 2.2m square, with power duct.
  • Garden room base: £70–£110 per m². Reinforced 100–150mm slab with membrane, blinding and ducts cast in to the supplier's layout.
  • Shed base up to 3m by 2.4m: £450–£850. Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal.

Prices are a guide. Your quote for Woking is a fixed price based on the details you give us. Full price guide.

Concrete Base Installation questions from Woking

Do your groundworkers cover areas near Woking?

Yes. Groundworkers in our network work across Woking, Guildford, Addlestone and the villages between. Enter your postcode on the quote form to find someone local.

Can an old base in Woking be removed and replaced?

Yes. Groundworkers covering Woking break out old bases, remove the waste and pour a new slab sized to your new building.

How long before I can build on a new base in Woking?

Most sheds in Woking can go up after three to seven days. Heavier buildings and hot tubs should wait at least a week, longer in cold weather.

Can concrete be pumped into my back garden in Woking?

Yes. Where access is tight in Woking, groundworkers can use a concrete pump or mini dumpers instead of barrowing everything through the house.

Do I need a damp-proof membrane under a concrete base?

For garden rooms, offices and anything you want to keep dry, yes. A polythene damp-proof membrane under the concrete stops ground moisture rising. Many groundworkers use one under shed bases too, as it costs little and helps keep the building dry.

Does a shed base need to be bigger than the shed?

Slightly. A base around 50mm larger than the shed on each side gives a firm edge without letting rain collect under the walls. Too large a margin lets water pool against the timber. Some suppliers recommend the base matches the floor size exactly.

Get a free concrete base installation quote in Woking

Tell us what you need and we'll come back with a clear price.

Request a quote