Guide · Homeowners · 4 min read · Updated 17 November 2026
Preparing for a Concrete Base: What Happens on the Day
Short answer
Before a concrete base is laid, clear the area, confirm the building size and position, check for buried cables and pipes, and plan a route for barrows or a lorry. Most shed and hot tub bases are dug, prepared and poured in one or two days. The concrete then needs time to cure: light sheds can often go up after about a week, heavier loads later.
Before the installer arrives
Good preparation saves time on the day and avoids surprises. Decide exactly where the building will go and leave enough room around it to open doors and windows, maintain the walls and, for garden rooms, meet any boundary distances you are relying on for permitted development or Building Regulations exemption. If you are buying a garden room, garage or hot tub, send the installer the supplier's base specification.
Clear the area of plants, pots, old sheds and anything stored there. If an old base or patio needs to come out, agree whether that is part of the quote. Think about where power, water and data need to enter the building so ducts can be cast in.
- Confirm the building's external size and position
- Share the supplier's base specification and level tolerance
- Clear the area of plants, pots and stored items
- Mark any known drains, cables, pipes or soakaways
- Decide where power, water and data ducts should come up
- Tell neighbours if a lorry or pump will be parked outside
- Keep pets and children away from the work area
What happens on day one
The crew sets out the base with pegs and string lines, checking that it is square by measuring the diagonals. Turf and topsoil are dug out down to firm ground, usually 150–250mm deep depending on the slab and sub-base thickness. On sloping sites, the high side is dug deeper or the low side built up with formwork and extra hardcore.
Timber formwork is fixed around the edge with pegs, set level or with a very slight fall if the base will stay exposed. Hardcore is spread in layers and compacted with a plate compactor, then blinded with sand. The membrane, any ducts and steel mesh on spacers follow. On small bases all of this and the pour may happen in a single day.
The pour
Small bases are often mixed on site in a mixer. Larger slabs use ready-mix concrete delivered by lorry, either chuted straight into the formwork, barrowed in or pumped through a hose where access is tight. The concrete is spread, compacted to remove air pockets and struck off level along the formwork using a straight edge. The surface is then tamped or floated to the agreed finish.
Ready-mix has a limited working time once it arrives, so the crew needs a clear route. Keep the access path free of cars, bins and garden furniture on pour day.
| Stage | Typical timing for a shed base | Typical timing for a garage base |
|---|---|---|
| Set out and excavation | Half a day | One day |
| Sub-base, formwork, membrane, mesh | Half a day | One day |
| Pour and finish | One to three hours | Half a day |
| Formwork removed | After a day or two | After a few days |
| Ready for building | Often around a week | Often longer; follow supplier advice |
Curing: the days after the pour
Concrete hardens through a chemical reaction with water, not by drying out, so it needs to stay damp for the first few days. In hot or windy weather your installer may cover the slab with polythene or ask you to dampen it. In cold weather, it may be covered with insulating blankets, and pouring is avoided when hard frost is forecast because frozen young concrete is permanently weakened.
Keep people, pets and wheelbarrows off the slab for at least a day. Small hairline surface cracks can appear as concrete shrinks and are generally cosmetic, but wider cracks or a slab that rocks should be reported to the installer.
Common problems that delay the job
Most base installations run to plan, but a few issues come up often enough to be worth knowing about. Old concrete, buried rubble or a forgotten patio under the lawn can turn a half-day dig into a full day with a breaker. Tree roots thicker than a thumb may need cutting back, and near protected trees you should check with your council first. Unmarked drains, soakaways and cables are another common surprise, which is why it helps to mark anything you know about.
Weather is the other variable. A crew will usually rearrange rather than pour into a waterlogged excavation or ahead of a hard frost.
Waste and tidy-up
Excavated turf and soil are removed from site at the end of the job, along with offcuts, packaging and any broken concrete. Soil and rubble are controlled waste, so whoever takes them away should be a registered waste carrier. If you would like to keep some topsoil for raised beds or levelling lawns elsewhere in the garden, say so before work starts.
Expect some mess on lawns and paths where barrows have run. A good crew uses boards to protect lawns and brushes down hard surfaces before leaving.
Booking the building installation
Coordinate the base date with your building or hot tub delivery. Many garden room installers want a base ready and cured a week or more before they arrive, and some ask for photos of the finished slab showing its dimensions and level. Leave a margin for weather, because a wet week can delay a pour.
We arrange concrete base installation through vetted, insured local groundworkers. Send your building size, supplier specification and photos of the site through the quote form and you will receive one all-in price.
Questions people also ask
Do I need to be home when the concrete base is laid?
It helps to be there at the start to confirm the position and size, and on pour day if a lorry needs parking space or access through a gate. Once the position is agreed and access is clear, many customers leave the crew to work and check the finished base later.
Can concrete be poured in the rain?
Light drizzle is usually manageable if the fresh slab is covered. Heavy rain can wash cement from the surface and spoil the finish, so installers often postpone. Pours are also avoided when hard frost is expected, because frozen young concrete loses strength permanently.
How long does a concrete base take to dry?
Concrete cures rather than dries. It can usually be walked on carefully after a day or two, and a light timber shed is often erected after around a week. Heavier buildings and hot tubs are best left longer, and concrete reaches its specified strength at about 28 days.
Written and checked by the Concrete Base Installation team. Read our editorial policy.
More guides
How Much Does a Concrete Base Cost in the UK?
A professionally laid concrete shed base up to 3m by 2.4m typically costs £450–£850 in the UK. Garden room bases cost £70–£110 per square metre, hot…
How Thick Should a Concrete Base Be? Sheds, Garden Rooms and More
A typical shed base is around 75–100mm of concrete on 75–100mm of compacted hardcore. Garden rooms usually need 100–150mm, often reinforced with…
Concrete Base vs Ground Screws vs Paving Slabs: Which Is Best?
A concrete base is the strongest and most versatile foundation for sheds, garden rooms, hot tubs and garages, costing £450–£850 for a typical shed…
What Base Does a Hot Tub Need? Requirements and Costs
Most hot tubs need a solid, flat, level base strong enough for the full weight when filled with water and people, which can be well over two tonnes.…
Get a free concrete base installation quote
Tell us what you need and we'll come back with a clear price.
Request a quote