Preparing for a Concrete Base: What Happens on the Day

Short answer

Before a concrete base is laid, clear the area, confirm the building size and position, check for buried cables and pipes, and plan a route for barrows or a lorry. Most shed and hot tub bases are dug, prepared and poured in one or two days. The concrete then needs time to cure: light sheds can often go up after about a week, heavier loads later.

Preparing for a Concrete Base: What Happens on the Day

Before the installer arrives

Good preparation saves time on the day and avoids surprises. Decide exactly where the building will go and leave enough room around it to open doors and windows, maintain the walls and, for garden rooms, meet any boundary distances you are relying on for permitted development or Building Regulations exemption. If you are buying a garden room, garage or hot tub, send the installer the supplier's base specification.

Clear the area of plants, pots, old sheds and anything stored there. If an old base or patio needs to come out, agree whether that is part of the quote. Think about where power, water and data need to enter the building so ducts can be cast in.

  • Confirm the building's external size and position
  • Share the supplier's base specification and level tolerance
  • Clear the area of plants, pots and stored items
  • Mark any known drains, cables, pipes or soakaways
  • Decide where power, water and data ducts should come up
  • Tell neighbours if a lorry or pump will be parked outside
  • Keep pets and children away from the work area

What happens on day one

The crew sets out the base with pegs and string lines, checking that it is square by measuring the diagonals. Turf and topsoil are dug out down to firm ground, usually 150–250mm deep depending on the slab and sub-base thickness. On sloping sites, the high side is dug deeper or the low side built up with formwork and extra hardcore.

Timber formwork is fixed around the edge with pegs, set level or with a very slight fall if the base will stay exposed. Hardcore is spread in layers and compacted with a plate compactor, then blinded with sand. The membrane, any ducts and steel mesh on spacers follow. On small bases all of this and the pour may happen in a single day.

The pour

Small bases are often mixed on site in a mixer. Larger slabs use ready-mix concrete delivered by lorry, either chuted straight into the formwork, barrowed in or pumped through a hose where access is tight. The concrete is spread, compacted to remove air pockets and struck off level along the formwork using a straight edge. The surface is then tamped or floated to the agreed finish.

Ready-mix has a limited working time once it arrives, so the crew needs a clear route. Keep the access path free of cars, bins and garden furniture on pour day.

StageTypical timing for a shed baseTypical timing for a garage base
Set out and excavationHalf a dayOne day
Sub-base, formwork, membrane, meshHalf a dayOne day
Pour and finishOne to three hoursHalf a day
Formwork removedAfter a day or twoAfter a few days
Ready for buildingOften around a weekOften longer; follow supplier advice

Curing: the days after the pour

Concrete hardens through a chemical reaction with water, not by drying out, so it needs to stay damp for the first few days. In hot or windy weather your installer may cover the slab with polythene or ask you to dampen it. In cold weather, it may be covered with insulating blankets, and pouring is avoided when hard frost is forecast because frozen young concrete is permanently weakened.

Keep people, pets and wheelbarrows off the slab for at least a day. Small hairline surface cracks can appear as concrete shrinks and are generally cosmetic, but wider cracks or a slab that rocks should be reported to the installer.

Common problems that delay the job

Most base installations run to plan, but a few issues come up often enough to be worth knowing about. Old concrete, buried rubble or a forgotten patio under the lawn can turn a half-day dig into a full day with a breaker. Tree roots thicker than a thumb may need cutting back, and near protected trees you should check with your council first. Unmarked drains, soakaways and cables are another common surprise, which is why it helps to mark anything you know about.

Weather is the other variable. A crew will usually rearrange rather than pour into a waterlogged excavation or ahead of a hard frost.

Waste and tidy-up

Excavated turf and soil are removed from site at the end of the job, along with offcuts, packaging and any broken concrete. Soil and rubble are controlled waste, so whoever takes them away should be a registered waste carrier. If you would like to keep some topsoil for raised beds or levelling lawns elsewhere in the garden, say so before work starts.

Expect some mess on lawns and paths where barrows have run. A good crew uses boards to protect lawns and brushes down hard surfaces before leaving.

Booking the building installation

Coordinate the base date with your building or hot tub delivery. Many garden room installers want a base ready and cured a week or more before they arrive, and some ask for photos of the finished slab showing its dimensions and level. Leave a margin for weather, because a wet week can delay a pour.

We arrange concrete base installation through vetted, insured local groundworkers. Send your building size, supplier specification and photos of the site through the quote form and you will receive one all-in price.

Questions people also ask

Do I need to be home when the concrete base is laid?

It helps to be there at the start to confirm the position and size, and on pour day if a lorry needs parking space or access through a gate. Once the position is agreed and access is clear, many customers leave the crew to work and check the finished base later.

Can concrete be poured in the rain?

Light drizzle is usually manageable if the fresh slab is covered. Heavy rain can wash cement from the surface and spoil the finish, so installers often postpone. Pours are also avoided when hard frost is expected, because frozen young concrete loses strength permanently.

How long does a concrete base take to dry?

Concrete cures rather than dries. It can usually be walked on carefully after a day or two, and a light timber shed is often erected after around a week. Heavier buildings and hot tubs are best left longer, and concrete reaches its specified strength at about 28 days.

Written and checked by the Concrete Base Installation team. Read our editorial policy.

Get a free concrete base installation quote

Tell us what you need and we'll come back with a clear price.

Request a quote