Concrete Base Installation
Shed and Summerhouse Bases
Level concrete slabs sized to your shed or summerhouse, on a compacted hardcore sub-base, ready for the building to go straight on.

What's involved
A shed base should be slightly larger than the building's footprint, usually by about 50mm on each side, so rain runs off rather than under the walls, but not so big that water sits around the frame. The groundworker marks out the base, strips turf and topsoil to around 150mm to 200mm deep, and lays a compacted layer of MOT Type 1 hardcore, around 75mm to 100mm thick. Timber formwork is fixed level, or with a very slight fall, and a damp-proof membrane laid. Concrete, typically around 100mm thick for a shed, is placed, tamped and floated flat. Most shed bases are dug and poured in a day. The building can usually go up after three to seven days, depending on the weather. Order your shed first so the base matches its exact dimensions.
How we handle it
Tell us what the base is for
Use the quote form to give the size, the building or item it will carry and the current ground surface. Include the supplier's base specification if you have it, and photos of access from the road.
Site visit and setting out
A local groundworker checks levels, ground conditions, access for barrows or a concrete lorry, and positions for ducts. They confirm slab thickness, reinforcement and sub-base depth for your use.
Fixed quote
You receive one price covering excavation, waste removal, hardcore, formwork, membrane, mesh, concrete and finishing. The quote states the slab thickness and size so you can compare like for like.
Dig, form and pour
Turf and soil are removed, hardcore compacted, formwork and membrane fixed, ducts placed and concrete poured and finished. Most domestic bases are prepared and poured in one or two days.
Curing and handover
The slab is covered to cure, protecting it from frost, rain or hot sun. The groundworker removes formwork and tells you when it is ready for your building, hot tub or garage.
Price guide
Concrete bases are priced mainly by area and thickness, with adjustments for access, excavation and reinforcement. Small bases carry a minimum charge because the labour, kit and delivery are similar whatever the size. Mixing by hand or using a mini mixer suits small pads, while larger slabs use ready-mix. The figures here reflect what UK homeowners typically pay for base work in 2026.
- Hot tub base: £600–£1,200. Reinforced level slab for a standard hot tub of around 2.2m square, with power duct.
- Single garage base: £1,800–£3,200. Thicker reinforced slab, typically around 6m by 3m, set out square for a sectional garage.
- Small pad for bins, tank or heat pump: from £250. Simple pads under about 2m², with several pads in one visit usually cheaper each.
Questions about shed and summerhouse bases
Can concrete bases be laid in winter?
Yes, with care. Concrete should not be poured onto frozen ground or when hard frost is expected before it sets. Groundworkers cover new slabs with insulating sheets or hessian in cold weather and may delay a pour if the forecast is very cold.
Other services
Garden Room and Office Bases
Reinforced slabs built to the garden room supplier's specification, with ducts for power, data and water cast in before the pour.
Hot Tub and Swim Spa Bases
Strong, level, reinforced slabs to carry the heavy load of a filled hot tub or swim spa, with power ducting and drainage considered.
Garage and Workshop Slabs
Thicker reinforced concrete slabs, often with thickened edges, for concrete sectional garages, timber workshops and steel buildings.
Concrete Pads and Hardstandings
Pads for bins, air source heat pumps, oil tanks, log stores, greenhouses and parking, built to suit the load and use.
Base Removal and Replacement
Breaking out cracked, sunken or undersized bases, removing the waste and pouring a new slab ready for your replacement building.