How much does a concrete shed base cost?

A concrete base for a typical shed up to about 3m by 2.4m usually costs £450 to £850 fitted, including excavation, hardcore, membrane and concrete. Larger bases for garden rooms cost around £70 to £110 per square metre. Difficult access or sloping ground adds to the price.

How thick should a concrete base be?

Around 100mm of concrete on 75mm to 100mm of compacted hardcore suits most sheds. Garden rooms and hot tubs usually need 100mm to 150mm with steel mesh. Garages and heavy loads typically need 150mm or more, reinforced. Always check your supplier's specification.

How long does a concrete base take to cure?

Concrete is usually firm enough to walk on within a day. Most sheds can be built on it after three to seven days. Heavier buildings and hot tubs should wait at least a week. Concrete continues to gain strength for around 28 days, and curing slows in cold weather.

Does a shed base need to be bigger than the shed?

Slightly. A base around 50mm larger than the shed on each side gives a firm edge without letting rain collect under the walls. Too large a margin lets water pool against the timber. Some suppliers recommend the base matches the floor size exactly.

Do I need a damp-proof membrane under a concrete base?

For garden rooms, offices and anything you want to keep dry, yes. A polythene damp-proof membrane under the concrete stops ground moisture rising. Many groundworkers use one under shed bases too, as it costs little and helps keep the building dry.

Does a concrete base need steel reinforcement?

Light shed bases often do not. Garden rooms, hot tubs, garages and bases on poor or variable ground usually benefit from steel mesh, which controls cracking and spreads the load. Your groundworker will recommend mesh based on what the base supports.

Can a concrete base be laid on a slope?

Yes. On a slope, the groundworker digs deeper on the high side and may build up the low side with formwork or blockwork, so the finished slab is level. Steep slopes may need a stepped base or a small retaining wall.

Do I need planning permission for a concrete base?

A base alone rarely needs planning permission in a back garden. The building that sits on it may need permission depending on its size, height and position. Large hard surfaces in front gardens in England must drain naturally or need permission.

Can concrete bases be laid in winter?

Yes, with care. Concrete should not be poured onto frozen ground or when hard frost is expected before it sets. Groundworkers cover new slabs with insulating sheets or hessian in cold weather and may delay a pour if the forecast is very cold.

What is the best base for a garden room?

It depends on the garden room design. Many suppliers specify a reinforced concrete slab; others use ground screws or concrete pads with a timber frame. A slab gives a solid, durable floor and is a good fit for heavier buildings.

How long does it take to lay a concrete base?

Most shed and hot tub bases are dug, formed and poured in a single day. Larger garden room or garage bases may take two days. Curing then takes several days before building, depending on the weather.

Can I put a hot tub on paving instead of concrete?

Only if the paving is laid on a solid, well-compacted base and is perfectly level. Many hot tub makers recommend a concrete slab to spread the load and protect the warranty. Check your hot tub's installation guide before deciding.

Get a free concrete base installation quote

Tell us what you need and we'll come back with a clear price.

Request a quote