Concrete Base Installation

Bromley · London

Concrete Base Installation in Orpington

Old shed base cracked or too small? Groundworkers covering Orpington break out, remove and replace bases in a day or two.

Tell us your base size in Orpington for a clear price.

Free Concrete Base Installation quote in Orpington

No obligation. We only use your details to reply about this job.

Covering Orpington and nearby

Orpington is in the Bromley council area in London. That includes the BR5, BR6, BR7 and DA14 postcode districts. Nearby places we also cover include Sidcup, Joyden's Wood, Hextable, Keston and Crockenhill.

What to expect in Orpington

Soft or uneven ground on rural properties near Orpington may need deeper hardcore to give a solid base. Larger plots around Orpington often need bigger slabs for workshops, stables or garages, delivered as ready-mix by lorry.

Much of the capital's housing is Victorian and Edwardian terraces, many split into flats, alongside a large stock of post-war estates and modern apartment blocks. Older gardens in Orpington sometimes hide old drains, coal bunkers or rubble, which groundworkers deal with before laying a new base.

Concrete Base Installation prices in Orpington

  • Garden room base: £70–£110 per m². Reinforced 100–150mm slab with membrane, blinding and ducts cast in to the supplier's layout.
  • Shed base up to 3m by 2.4m: £450–£850. Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal.
  • Break out and remove old base: from £300. Breaking up and taking away an existing shed-sized slab, before a new one is poured.

Prices are a guide. Your quote for Orpington is a fixed price based on the details you give us. Full price guide.

Concrete Base Installation questions from Orpington

Do you lay heat pump pads in Orpington?

Yes. Groundworkers across Bromley lay small concrete pads for heat pumps, oil tanks and bins, often several in one visit.

Do I need permission for a garden room base in Orpington?

The base itself rarely needs permission, but the building may, depending on size and position. Check the permitted development rules or ask Bromley if unsure.

How soon can a concrete base be laid in Orpington?

Groundworkers covering Orpington can often visit within a week or two. Most bases are poured in a day or two, then left to cure before your building arrives.

Will my supplier's base specification be followed in Orpington?

Yes. Share your shed or garden room supplier's base drawing and groundworkers in Orpington will build to it, including size, thickness and duct positions.

Do I need planning permission for a concrete base?

A base alone rarely needs planning permission in a back garden. The building that sits on it may need permission depending on its size, height and position. Large hard surfaces in front gardens in England must drain naturally or need permission.

How long does a concrete base take to cure?

Concrete is usually firm enough to walk on within a day. Most sheds can be built on it after three to seven days. Heavier buildings and hot tubs should wait at least a week. Concrete continues to gain strength for around 28 days, and curing slows in cold weather.

Get a free concrete base installation quote in Orpington

Tell us what you need and we'll come back with a clear price.

Request a quote