Stockport · North West
Concrete Base Installation in Cheadle Hulme
We arrange concrete base installation in Cheadle Hulme, Bramhall and Hazel Grove, covering excavation, sub-base, pouring and waste removal.
Cheadle Hulme and the surrounding area
Cheadle Hulme is in the Stockport council area in the North West. Postcodes we cover here include SK8 and SK7. We also take jobs in Wythenshawe, Gatley, Heald Green, Handforth and Dean Row.
Working in Cheadle Hulme
The North West is one of the wetter regions of England, and its towns are built around dense Victorian terraces as well as large post-war and modern estates. Older gardens in Cheadle Hulme sometimes hide old drains, coal bunkers or rubble, which groundworkers deal with before laying a new base.
Heat pump installations in Cheadle Hulme often need small concrete pads placed precisely to meet manufacturer clearances. Suburban gardens in Cheadle Hulme commonly need shed and summerhouse bases, often with side access wide enough for a mini dumper.
Our services in Cheadle Hulme
Concrete Pads and Hardstandings
Pads for bins, air source heat pumps, oil tanks, log stores, greenhouses and parking, built to suit the load and use.
Garage and Workshop Slabs
Thicker reinforced concrete slabs, often with thickened edges, for concrete sectional garages, timber workshops and steel buildings.
Hot Tub and Swim Spa Bases
Strong, level, reinforced slabs to carry the heavy load of a filled hot tub or swim spa, with power ducting and drainage considered.
Garden Room and Office Bases
Reinforced slabs built to the garden room supplier's specification, with ducts for power, data and water cast in before the pour.
Shed and Summerhouse Bases
Level concrete slabs sized to your shed or summerhouse, on a compacted hardcore sub-base, ready for the building to go straight on.
Base Removal and Replacement
Breaking out cracked, sunken or undersized bases, removing the waste and pouring a new slab ready for your replacement building.
Guide prices for Cheadle Hulme
- Small pad for bins, tank or heat pump: from £250. Simple pads under about 2m², with several pads in one visit usually cheaper each.
- Break out and remove old base: from £300. Breaking up and taking away an existing shed-sized slab, before a new one is poured.
- Shed base up to 3m by 2.4m: £450–£850. Around 100mm of concrete on compacted hardcore with membrane, including excavation and spoil removal.
Prices are a guide. Your quote for Cheadle Hulme is a fixed price based on the details you give us. Full price guide.
Concrete Base Installation questions from Cheadle Hulme
How long before I can build on a new base in Cheadle Hulme?
Most sheds in Cheadle Hulme can go up after three to seven days. Heavier buildings and hot tubs should wait at least a week, longer in cold weather.
Will my supplier's base specification be followed in Cheadle Hulme?
Yes. Share your shed or garden room supplier's base drawing and groundworkers in Cheadle Hulme will build to it, including size, thickness and duct positions.
Do you lay heat pump pads in Cheadle Hulme?
Yes. Groundworkers across Stockport lay small concrete pads for heat pumps, oil tanks and bins, often several in one visit.
Can an old base in Cheadle Hulme be removed and replaced?
Yes. Groundworkers covering Cheadle Hulme break out old bases, remove the waste and pour a new slab sized to your new building.
Can concrete bases be laid in winter?
Yes, with care. Concrete should not be poured onto frozen ground or when hard frost is expected before it sets. Groundworkers cover new slabs with insulating sheets or hessian in cold weather and may delay a pour if the forecast is very cold.
Do I need planning permission for a concrete base?
A base alone rarely needs planning permission in a back garden. The building that sits on it may need permission depending on its size, height and position. Large hard surfaces in front gardens in England must drain naturally or need permission.
Helpful guides
Concrete Base vs Ground Screws vs Paving Slabs: Which Is Best?
A concrete base is the strongest and most versatile foundation for sheds, garden rooms, hot tubs and garages, costing £450–£850 for a…
Read the guide →What Base Does a Hot Tub Need? Requirements and Costs
Most hot tubs need a solid, flat, level base strong enough for the full weight when filled with water and people, which can be well over…
Read the guide →Get a free concrete base installation quote in Cheadle Hulme
Tell us what you need and we'll come back with a clear price.
Request a quote